§ 20-255. Filing and processing.  


Latest version.
  • A vesting tentative map shall be filed in the same form and have the same contents, accompanying data and reports and shall be processed in the same manner as set forth in the county subdivision ordinance for a tentative map except as hereinafter provided:

    (a)

    At the time a vesting tentative map is filed it shall have printed conspicuously on its face the words "Vesting Tentative Map."

    (b)

    At the time a vesting tentative map is filed a subdivider shall also supply the following information:

    (1)

    An erosion control plan which complies with the Erosion and Sediment Control Handbook, Department of Conservation, May 1981.

    (2)

    A geologic study for all properties within five hundred (500) feet of an earthquake fault whether inferred or active, or within a special studies zone as shown on the Butte County General Plan Seismic Safety Element.

    (3)

    Fire safety plan (water storage, building construction materials, interior sprinklers, vegetation removal) for all areas designated as high or extreme hazard by the Butte County General Plan Safety Element.

    (4)

    Biologic and botanical surveys of all drainage swales, creek or river frontages, vernal pools, wetland areas (marsh, mountain meadow riparian), valley oak woodland, or areas of special biological importance as mapped by the department of fish and game, waterfowl concentration areas, anadramous and warm water fisheries.

    (5)

    Flood hazard information for any designated zone A flood boundary.

    (6)

    Noise survey of immediate environment (within two hundred (200) feet of all property lines).

    (7)

    Lighting plan.

    (8)

    Archaeological survey for all areas designated moderate or high on Butte County maps.

    (9)

    Height of structures for any building within clear zone or approach zone of nearby airport as mapped by the airport land use commission.

    (c)

    At the time a vesting map is filed, the subdivider shall have received prior approval on any required zoning changes.

    (d)

    At the time a vesting map is filed, the subdivider shall file for any necessary use permit and the approval of any vesting map is contingent upon approval of said use permit.

(Ord. No. 3188, § 1(Exh. A), 3-14-95)