§ 3-13. Imposition of development impact fees for jail facilities.  


Latest version.
  • A jail facilities development impact fee shall be authorized and levied upon any owner of real property located in the unincorporated and incorporated area of Butte County, with the fee to be collected in the incorporated area by each respective municipality through an agreement with Butte County, adding one (1) or more residential units to such property incident to the construction of a new building on the property, the installation of a mobile home or factory-built home on the property or connection thereof to utilities, or change of any use of a building that is other than residential on the property to a residential use. Fees authorized and levied hereunder as to the installation of a mobile home or factory-built home or the connection of a mobile home or factory-built home to utilities shall only be authorized and levied at the initial location of said mobile home or factory-built home in the unincorporated or incorporated area of Butte County and if such location is on a space, site or other property on which no other mobile home or factory-built home was previously located.

(Ord. No. 3967, § 1 (part), 7-10-07)